As industrial facilities, renewable energy projects, and distribution networks advance, the need for stable electoral infrastructure grows. Traditional electrical buildings have played this role throughout many years. However, their construction may require a lot of civil engineering work, stages of installation, and the actions of a number of different contractors.
An electrical house (eHouse) is a solution to this problem. It is a prefabricated structure used for installation of different electrical equipment, control systems, and associated components within one unit. As most of structural works and installation of equipment can be done in the factory to deliver the unit to its destination.
The approach alters the whole process of design, assembly, and implementation of electric infrastructures. Instead of building electrical rooms entirely locally, it enables the installation of parts of the complex in advance. But what is eHouse, how does it work, and when should it be utilized? Knowing its characteristics and construction requirements is essential for making qualitative decisions by engineers and project developers.
Electric House, which is also known as eHouse is a modular enclosure that is pre-manufactured and is specially classified to house electrical equipment and monitor the distribution of electricity. It is used either to store MV switchgear or LV switchgear as well as transformers, control cabinets, protection relays, control systems, and other auxiliary electrical components.
An eHouse is the building that has been manufactured and assembled in a factory, unlike a traditional electrical building that is built on site. After the construction of the ehouse has been completed, it will be brought to the site to be installed, connected, and made operational. Ehouse might also be referred to as a modular electric house or prefabricated electric house or container substation, but these terms are not always synonymous. The actual form of the eHouse deductions of the equipment being installed and the electrical functions which the electrical house will be carrying out.
As instances, some systems allow room for distribution switchgear, and others are based on power generation, energy storage, or industrial automation systems. However, it does not matter what kind of equipment it is, as the goal is similar, namely, to create a safe and structured environment for electrical equipment while minimizing the construction and integration at the location.
E-House works as one electrical equipment room. The enclosure gives it the environment, while the devices present inside perform the functions of supplying electricity, safeguarding it, controlling it and monitoring it.
The exact operating arrangement varies according to the application. A typical configuration may include the following elements:
The relationship between these elements is crucial. Electrical devices produce heat, have enough operational space, and must be arranged in such a way that it allows safe maintenance. Thus, eHouse cannot be considered a mere metal box with electrical devices placed in it. The arrangement inside the container, ventilation, cable distribution, construction, and safety solutions should all be studied together.
Although configurations differ between projects, most prefabricated electrical house solutions contain several common structural and functional elements.
| Component | Primary Function | Important Consideration |
| Steel enclosure | Protects internal equipment | Structural strength and corrosion resistance |
| MV/LV switchgear | Controls and distributes electrical power | Voltage rating and fault-handling capacity |
| Transformer | Changes electrical voltage levels | Capacity, cooling, and installation arrangement |
| Control cabinets | Supports system operation and monitoring | Accessibility and equipment compatibility |
| HVAC system | Regulates internal temperature | Equipment heat load and ambient conditions |
| Fire protection | Provides protection against fire-related hazards | Applicable fire safety requirements |
| Cable management | Organizes electrical connections | Cable entry, routing, and separation |
Not every eHouse requires all these components. For instance, a unit designed primarily for control equipment may not need an integrated transformer. The equipment arrangement should therefore be established during the engineering stage rather than determined after the enclosure has been manufactured.
Because of its flexibility the eHouse can be used for numerous industrial and infrastructure projects. Its use will depend on the electrical equipment used, the environment where it will be implemented and the extent of required integration.
Where independent power generation is required, a containerized generator system provides a separate enclosure for generator equipment and its supporting systems. Electricity generation plants need electrical areas for switchgear, interlocking, and control devices. eHouse delivers a centralized infrastructure for these devices, which is important in bringing the power supply from the generation plant to utility lines. E-house is also applicable in substations considering the use of prefabricated electrical components for the given projects.
In solar installations, a mobile solar container can provide a prefabricated platform for deploying solar generation equipment in remote or grid-connected locations. Solar and wind energy systems are frequently installed in locations not suited for traditional construction. A module electrical house can house inverters, switchgear, transformers, and other electrical devices depending on the system setup. For big installations of solar panels, several units may be deployed for the various sections of the electrical grid.
Battery energy storage projects make use of a variety of electrical components for power conversion, distribution, safety, and monitoring purposes. An eHouse can house certain electrical equipment related to the battery system, which includes power conversion equipment and switchgear. However, battery modules may need to be housed in separate battery enclosures. This distinction is important because different ventilation and fire protection/safety requirements may apply in electrical rooms and battery compartments.
For related applications, see the Energy Storage Container.
Transport problems, lack of building materials, and difficult environmental conditions are common problems faced by a remote industrial site. A prefabricated electrical house can reduce the amount of construction work in such places. The enclosure may feature additional insulation, rust protection, ventilation, and other environmental solutions, which depend on its design.
For data centers to maintain continuous supply of electricity and smooth operation, it is essential that reliable equipment functions continuously. The same goes for the railway sector, where electricity control systems play an important role in every other location. The advantage of using the modular eHouse is that it provides adequate space for necessary equipment and gives engineering specialists an opportunity of doing factory preparations in kith with on-site constructions.
The increasing implementation of eHouse systems can be connected with the method of its construction. Their benefits go beyond the fast delivery or installation. They can also be connected with coordinating construction, integrating equipment, and maintaining the project on an ongoing basis.
One of the primary benefits is that most of the process of making these components and assembling the equipment is done prior to installation. While there is still a need to prepare the site and connect external power lines, this method usually requires a relatively limited amount of construction activities on site compared to a traditional electrical structure.
Factory construction and site preparation tend to happen at the same time. This enables contractors to carry out different responsibilities instead of just waiting for the entire building to be erected to install the electrical equipment. However, the exact schedule depends on the engineering approval, availability of the equipment, means of transportation, and the commissioning requirements.
Making items in a controlled environment helps to carry out structural inspections, installation checks, and factory testing ahead of time. However, this does not mean that site acceptance tests or commissioning are eliminated. It only allows performing more proving work before the equipment arrives at the end point.
A modular E-house can be created with reference to different types of equipment arrangement and project requirements. The electrical house may have a single-room or multi-room layout, walk-in or non-walk-in installation, and skid-mounted or trailer-mounted designs, depending on their application.
Electrical installations that take place outdoors can be subject to various factors that may harm them. Factors such as moisture, dust, temperature variations, and strong winds. The right type of enclosure designed with protection and insulation in mind should be able to counteract these factors. The type of protection should be determined based on the conditions as they apply to the actual installation site.
The primary objective of eHouses and conventional electrical buildings is to host and safeguard electric equipment. However, the construction approach of both differ in that it impacts project integration.
| Comparison Criteria | Electrical House (eHouse) | Traditional Electrical Building |
| Construction | Mainly factory-prefabricated | Primarily constructed on-site |
| Installation | Delivered as an assembled or partially assembled unit | Requires extensive site installation |
| Civil Work | Generally reduced | Often requires substantial civil construction |
| Equipment Integration | Can be completed partly in the factory | Commonly completed at the project location |
| Layout | Designed around specific equipment requirements | Can offer greater flexibility for large building layouts |
| Relocation | Possible with suitable structural and transport arrangements | Generally difficult |
| Project Scheduling | Allows parallel factory and site activities | More dependent on sequential construction activities |
No single method works for every project. A typical electrical facility might be a better solution if the project requires a lot of room, involves complex architectural designs, or needs to be connected to a major industrial building.
Meanwhile, an eHouse option may take precedence where time is short, there are limited construction resources available on the site, or when equipment is needed in its modular configuration. Choosing either option is a matter of considering the entire scope of the project rather than the installation time.
Selecting an eHouse requires more than determining its external dimensions. Several engineering factors influence its safety, performance, and suitability for long-term operation.
The enclosure should be able to tackle the transport loads, installation conditions and the environmental effects during operation. Material selection depends on the place of installation. Depending on the application, various materials can be used, including weatherproof steel, protective coatings, insulating substance and structural reinforcements.
For container-based structures, ISO 1496-1 provides specifications and testing requirements for certain Series 1 freight containers. However, compliance with this standard alone does not establish the complete suitability of a modified electrical enclosure. See the ISO standard for its defined scope.
Choosing electrical appliances needs to be done according to the voltage vibration of the power system, the current ratings of the connection, criteria of short-circuit, and rules of the local legislation. IEC 62271-202:2022 covers AC prefabricated substations for rated voltages above 1 kV and up to 52 kV. It sets out their service conditions, rated characteristics, general structural requirements and test methods. It should be applied only where its scope matches the actual system design, rather than assumed to cover every type of eHouse.
It also addresses protection of personnel and installation conditions. The standard should be applied where its scope is relevant to the actual system design, rather than assumed to cover every type of eHouse. More information is available from the International Electrotechnical Commission (IEC).
Heat is created when electrical devices operate. If the heat is not managed properly, internal temperatures may rise too high and affect the operation of the equipment. The HVAC system has to work based on the heat load of all equipment, the limitations of the devices in operation, the environment, and future operating conditions.
The IP rating of an enclosure denotes its effectiveness in preventing the ingress of solid particles and moisture. For instance, a unit with an IP54 rating protects against dangerous accumulations of dust, as well as preventing water splashes from entering. Equipment with an IP65 rating is impermeable to dust and offers protection from jets of water, but it is not suitable for sensor devices. The necessary rating will vary depending on the specific installation conditions and the electrical accessories used.
The IP rating of an enclosure denotes its effectiveness in preventing the ingress of solid particles and moisture. For instance, a unit with an IP54 rating protects against dangerous accumulations of dust, as well as preventing water splashes from entering. Equipment with an IP65 rating is impermeable to dust and offers protection from jets of water, but it is not suitable for sensor devices. The necessary rating will vary depending on the specific installation conditions and the electrical accessories used.
The following table summarizes several important design parameters.
| Design Parameter | What Needs to Be Evaluated |
| Voltage rating | Compatibility with the electrical network |
| Structural material | Mechanical strength and corrosion resistance |
| IP rating | Exposure to dust and water |
| Operating temperature | Ambient conditions and internal heat generation |
| HVAC capacity | Equipment heat load and ventilation requirements |
| Cable entry | Routing, sealing, and connection arrangements |
| Fire protection | Applicable project safety requirements |
| Installation altitude | Electrical insulation and cooling requirements |
Similar customization principles are also used in other customized equipment container applications, where enclosure dimensions and internal arrangements are determined by the equipment requirements. Standard enclosures may not satisfy the needs of all projects. Customizing the enclosure allows for making its inside structure adaptable to the equipment and working conditions of the particular site.
Common customization options include:
Configurations of the walk-in and non-walk-in types are offered as well. In walk-in type configurations, internal access is given to authorized personnel, while a non-walk-in configuration reduces the space needed for the apparatus. The final decision concerning customization must be made prior to the beginning of production. Delays in altering the sizes of the equipment or the connections between the cables or the ventilation system may lead to new engineering and manufacturing processes.
Before selecting a prefabricated electrical house, project owners and engineering teams should establish the technical and operational requirements.
The following questions provide a useful starting point:
It is equally crucial to study the drawings of the manufacturer, the equipment schedule, the specifications of the materials used, and the inspection history. Factory tests cannot be considered the same as complete commissioning. External wiring, grounding, protection coordination, and integration into the general electrical network must be verified at the installation site.
A clear technical specification helps reduce misunderstandings between the manufacturer, electrical contractor, and project owner.
In order to know how these factors take on content, it is possible to analyze the case of a reference model of an electrical house with a size of 20 feet. What will follow in this section are figures taken from the official information provided by the manufacturers about their products. These are some specific examples of the design of eHouses and not a standard dimension of electric houses in general.
| Parameter | Reference Specification |
| Unit Type | 20ft Electrical House |
| External Dimensions | 6,096 × 2,438 × 2,896 mm |
| Internal Dimensions | 5,898 × 2,252 × 2,493 mm |
| Cubic Capacity | 33 CBM |
| Structural Material | SPA-H weather-resistant steel |
| Floor | Steel |
| Tare Weight | 5,000 kg |
| Maximum Gross Weight | 30,480 kg |
| Maximum Cargo Weight | 25,480 kg |
| Standard IP Rating | IP54 |
| Reference Operating Temperature | −20°C to +50°C |
| Certification | CSC Certificate |
The enclosure can be configured with different electrical layouts, ventilation arrangements, and protective features. These figures should be assessed alongside the actual equipment weight, heat generation, electrical requirements, and transportation restrictions before finalizing a project design.
1. What is the difference between an eHouse and a containerized substation?
An eHouse refers to a type of prefabricated chamber in which equipment associated with electricity is fitted. One of the specific applications would be a containerized substation where equipment specifically used to transform, switch, and distribute electricity is installed. Despite the fact that these two terms are often incorrectly seen as interchangeable, it is not true that all e-houses can be considered full-fledged substations.
2. Can an eHouse be used in outdoor and harsh environments?
Yes. A properly designed eHouse can be utilized outside and adapted to difficult climate conditions. According to the location, it can include anti-corrosion coating, protection from the weather, insulation, air conditioning, and the necessary ingress protection. The end configuration depends on the environmental analysis of the project and the equipment setup.
3. How long does it take to manufacture and install an eHouse?
The schedule of work is contingent on the area of the enclosure, the availability of equipment, the specific needs in the way of customization, testing processes, and transportation measures as well. Prefabrication allows for production of structures and some integration of the equipment before the project is delivered. As is stated by the manufacturer in its resume, the typical time frame of a project depends on the type of configuration and is around 6-10 weeks. Nevertheless, this statement cannot be regarded as the time frame of every project.
An Electrical House (eHouse) offers a viable alternative to traditional electrical construction, especially with regard to aspects such as project schedule, equipment integration, and site constraints.
The main advantage of the electric house lies in the fact that it combines a specially designed shell with the electrical and ancillary systems necessary for a specific application. However, just relying on prefabrication is not enough for the eHouse to work properly.
For project owners and engineers, the most important step is to establish the technical requirements before selecting an enclosure. A properly specified eHouse can simplify installation planning and provide a more organized approach to deploying electrical infrastructure.
Looking for an Electrical House for an industrial, renewable energy, or power distribution project? ZN MEOX provides customized eHouse solutions with different structural dimensions, equipment layouts, and environmental protection options. Contact the engineering team to discuss your project requirements and determine a suitable configuration.
Disclaimer
The technical information, dimensions, materials, and configurations mentioned in this article are based on the container products manufactured by ZN MEOX. Specifications, materials, performance characteristics, and technical information can vary according to project requirements, customization, and relevant standards. Final specifications should be confirmed through the approved engineering drawings and technical documentation before any production or installation.
A practical buyer's guide for logistics managers, contractors and site operators. A standard steel storage container is strong, secure and…
Every construction site, mine, remote camp and temporary project require a workplace, and it needs it right away. The shipping…
Not every location is in need of a large-scale solar farm. However, a telecom tower, a surveying station, a small…
The concept of a container home for Australia is a prefab home which utilizes a steel shipping container as its…
Europe's first container home is a factory-built home using a steel shipping container, designed for European codes, climates, and authorization.…
Electricity prices vary, the power grid is offline, and remote power plants are forced to rely on expensive diesel energy.…